Projects
CIMACS 3.1
Delivered CIMACS 3.1
Delivery Date: 6th May 2022
Customer: COSL
AUTO-LAS Chemical Injection System
Duration: 5 week
CIMACS Site Integration
Chemical Injection System
End User: PTTEP
Rig: SLTS
8” x 5” Dual Rock Catcher
Delivery Date: 10th May 2022
Handrail
Delivery Date: 12th May 2022
Diaphragm Pump Frame
Delivery Date: 4th May 2022
Pneumatic Valve Control
Delivery Date: 4th May 2022
Chemical Storage Tank with Pneumatic Agitator and Magnetic Level Indicator
Delivery Date: 4th May 2022
Air Receiver
Delivery Date: May 2022
ABS Certified Air Receiver, ASME “U” ,DOSH certified and optional with DNV 2.7-1 Lifting Frame.